For shopping malls, holiday lighting projects often face two challenges at once: no clear vision of what effect to achieve, and no time to figure it out. The design isn't ready, but the installation team is already waiting. After rounds of revisions, production time gets squeezed. The result? Either settle for less or scrap the plan entirely. This isn't a capability problem. It's a rhythm problem — and a professional support problem.
How LEJIN Delivered from Brief to Completion
Last year, a mall client approached us for a festival lighting installation. Large space. High expectations. Tight timeline — and on top of that, the client didn't yet have a clear idea of what they wanted.
The day the order came in, we held an online meeting with the client and gathered site photos and video footage. Within two days, we had mapped out the venue conditions, budget range, expected atmosphere, and installation constraints. Day three was spent on requirements analysis and solution planning — all done efficiently via calls, video meetings, and file sharing. No endless back-and-forth forms.

Concept in 7 Days — Every Step Well Executed
We followed a clear sequence: first, we developed detailed design models for the client to confirm the overall shape and spatial layout. The design team worked with great precision — the first draft of the decorative lighting was approved without any revisions. Once the modeling was confirmed, we moved on to rendering, bringing the lighting effects and scene atmosphere to life. That too passed on the first review.
From modeling to rendering, everything was completed in 5 days. The full design proposal was delivered by day 7. This wasn't about rushing — it was about getting every step right from the start.

Delivery in 30 Days — Production Follows Design Without a Gap
The day the design was approved, production received the scheduling order. A significant portion of this project required custom work— including smart decoration light elements with specific lighting effects —but with our own production lines and in-house mold workshop, there was no waiting for outsourced slots. Materials were pre-stocked, and we added extra shifts at key stages to keep everything moving. No idle time. No bottlenecks. From mold-making and sampling to mass production, all milestones stayed on track. Within one month, all goods were completed and shipped — and the client never had to chase us for updates.

Mall string light projects aren't won by any single strength — design, production, and delivery all have to work together. Have a clear vision? We'll execute it. No direction yet? We'll help you find it. Tight timeline? We'll keep the rhythm for you. LEJIN has been in this business for 26 years. Our real strength isn't just making lights — it's taking a project from start to finish, smoothly and on time, no matter how tight the schedule. If you're racing against a deadline, or still figuring out what you want — feel free to bring your challenges to us.